- Home
- Government
- Departments
- Engineering, Permits & Planning
- Bicycle & Pedestrian Master Plan Development
Bicycle & Pedestrian Master Plan Development
01 - Base Mapping
01a-Task 1
01b-Task 1 Maps
- 1-ADT (JPG)
- 1-Jurisdiction (JPG)
- 1-Shoulder Width (JPG)
- 1-width and lanes (JPG)
- 2-Base Map Roads (JPG)
- 3a-Future Trip Generator Service Areas (JPG)
- 3a-Park Service Areas (JPG)
- 3a-School Service Areas (JPG)
- 3a-Trail Access Service Areas (JPG)
- 3b-School Service Areas Overlays (JPG)
- 4-Sherwood Heat Map with RRM Stops (JPG)
- 4a-Schools Heat Map (JPG)
- 4b-Sherwood Heat Map - Reclassified (JPG)
- 4c-Sherwood Heat Map Future Generators (JPG)
- 4d-Sherwood Heat Map EX and Future Generators (JPG)
- Sherwood Heat Map EX and Future with Trails (JPG)
- Trails Comp Plan (JPG)
02 - Draft Network
02a-Task 2
02b-Steering Committee Meeting 1-2 combined
02b-Steering Committee Meeting 1-2 Results
- Group Notes Summarized (PDF)
- Opportunities and Constraints Group 1 (PDF)
- Opportunities and Constraints Group 2 (PDF)
- Preliminary Network Notes Group 1 (PDF)
- Preliminary Network Notes Group 2 (PDF)
- Sherwood Bike and Pedestrian Plan Steering Committee 1 Poster (PDF)
- Steering Committee Facility Preferences (PDF)
02c-Public Meeting 1-2 combined
- 1-Bike and Pedestrian Health and Survey (JPG)
- 2-Bike and Pedestrian Map Sheet (JPG)
- 3-Bike Ped Network Board (JPG)
- 4-User Preferences Facility Types (JPG)
- 5-Prioritization Board (JPG)
- Draft Intersection Plan 9.13 (PNG)
- Draft Network 9.14 (PNG)
- Draft Sidewalk Plan 10.4 (PNG)
- Print Flyer (PDF)
- Sign in Sheet Public Open House 100721 (PDF)